Christ the King College

Christ the King Main

Design Brief Aliport Commercial were first contacted in October 2014 about this project. Christ the King College were looking for two identical Apex Entrance Canopies on two separate entrances which they requested be Powder-Coated Black providing the RAL number and also glazed with glass rather than standard polycarbonate roof sheets. Site Conditions Aliport Commercial undertook a single site visit to fully understand the project, measure up and produce the designs for the new canopies to be installed. At the time of the canopy installation the site was going through an extensive refurbishment both inside and outside so considerations had to…

May 26, 2016 / by Functio-km / Comments are off for this post

Kings Oak Primary School

Kings Oak Main

Design Brief Aliport Commercial were first contacted in January 2015 about this project. Kings Oak Primary were having an extension constructed in the summer and required a walkway to link the old and new buildings and also several outdoor learning areas constructed. Structures had to be freestanding, independent of the building structure and be water tight. Kings Oak Primary School requested 2 Apex Canopies and 1 x Mono Canopy to be installed with a total footprint of 330m². Site Conditions Aliport Commercial undertook 2 site visits to fully understand the project, measure up and produce the designs for the new…

May 26, 2016 / by Functio-km / Comments are off for this post