St Andrews and St Marks Primary School

SASM Main

Design Brief

Aliport Commercial were first contacted in June 2015 about this project. St Andrews and St Marks Primary have had a number of new buildings constructed and required canopies and walkways to provide outside shelter and walkways between old and new buildings.

Site Conditions

Aliport Commercial undertook two site visits to fully understand the project, measure up and produce the designs for the new canopy. The works were undertaken whilst the school was operational. Across the site there were varying ground levels and building ages posing some challenges to install the canopies consistently across the site.

Aliport Solution

Aliport Commercial commenced works in December 2015 and over a 2.5 week duration installed the canopies and walkways. The Aluminium was powder-coated white. The work areas were segregated using HERAS fencing to ensure that the works areas did not impact on the operational school. The Installations were completed successfully and look fantastic across site including one Walkways spanning a stunning 60m.


Facts

  • Installation Date: December 2015
  • Location: Kingston
  • Installation Type: Mono / Walkway
  • Installation Size: 156m²
  • Installation Duration: 2.5 Weeks
  • Value Range: £20k - £50k

Mono / Walkway Canopies

Mono Canopies can be used to create perfect walkways for sheltered passage between buildings. . .

Purpose

Aliport Commercial were commissioned to create Walkways and Canopies across the site to provide shelter and walkways between old and new buildings