Projects Archive - Yorkshire Canopies

Albourne Primary School

Albourne Main

Design Brief Aliport Commercial were first contacted in June 2013 about this project. Abingdon Preparatory School required a sheltered entrance canopy to their building that matched the colouring of existing metalwork, etc… on site. Site Conditions Aliport Commercial undertook a two site visits to fully understand the project, measure up and produce the designs for the new canopy to be installed. The site conditions were good during the installation with the installation being undertaken during the school holidays. Aliport Solution Aliport Commercial commenced works in August 2013 and over a 2 day duration installed the canopy. The Canopy was powder-coated blue and matched to existing metal work on site to provide…

Jun 15, 2016 / by Amy Rance / Comments are off for this post

Roller Shutters

Roller Shutters Main

Roller Shutters allow for Storage and Security of your Canopy and the contents.

Jun 10, 2016 / by Functio-km / Comments are off for this post

Sheet Stencils

Sheet Stencils Main

Sheet Stencils are bespoke designs stenciled onto your Canopy in order to provide a creative and imaginative space.

Jun 10, 2016 / by Functio-km / Comments are off for this post

Side Screens

Side Screen Main

Side Screens can be installed to the sides and / or the front of the canopy and provide additional shelter as well as storage and security options where required.

Jun 10, 2016 / by Functio-km / Comments are off for this post

Post Protectors

Post Protectors Main

Post Protectors provide a safety barrier between the outdoor play area and the steel beams of the canopy and can be provided in any colour or a combination of colours.

Jun 10, 2016 / by Functio-km / Comments are off for this post

Aftercare

Maintenance Main

Aliport Commercial can offer a full After-Care package for maintenance of your installed Canopy, Walkway or Covered Area.  We offer a number of After Care packages which work alongside and extend the warranties that we offer our Customers on their installed structures. Our After-Care Packages all include:- Regular Checks on the fixings and fittings of your Canopy, Covered Area or Walkway Regular Cleaning of the main structure and roof sheets Any repairs required to the roof sheets and fixings Ensuring Seals intact between Canopy and Building (where applicable). Re-sealing where necessary Cleaning and maintenance of any Extras installed with the…

Jun 03, 2016 / by Functio-km / Comments are off for this post

St Andrews and St Marks Primary School

SASM Main

Design Brief Aliport Commercial were first contacted in June 2015 about this project. St Andrews and St Marks Primary have had a number of new buildings constructed and required canopies and walkways to provide outside shelter and walkways between old and new buildings. Site Conditions Aliport Commercial undertook two site visits to fully understand the project, measure up and produce the designs for the new canopy. The works were undertaken whilst the school was operational. Across the site there were varying ground levels and building ages posing some challenges to install the canopies consistently across the site. Aliport Solution Aliport…

May 31, 2016 / by Functio-km / Comments are off for this post

Twineham CofE School

Twinham Main

Design Brief Aliport Commercial were first contacted in December 2014 about this project. Twineham CofE required an Outdoor Play Area for their children which also doubled as a sheltered waiting area for parents when picking up children from school. Site Conditions Aliport Commercial undertook three site visits to fully understand the project, measure up and produce the designs for the new canopy. No other works were being undertaken on site and the work area was clear and tidy so site conditions were good for the installation. Aliport Solution Aliport Commercial commenced works in May 2015 and over a 4 day…

May 31, 2016 / by Functio-km / Comments are off for this post

Holy Trinity

Holy Trinity Main

Design Brief Aliport Commercial were first contacted in February 2015 about this project. Holy Trinity was in need of additional space for the children to play and enjoy and also an outdoor play area where the children could enjoy the fresh air without being restricted by the weather. The School not only wanted this to be a usable space but also a colourful and vibrant space. Site Conditions Aliport Commercial undertook two site visits to fully understand the project, measure up and produce the designs for the new canopy. No other works were being undertaken on site and the work…

May 31, 2016 / by Functio-km / Comments are off for this post

St Pancras Catholic Primary School

St Pancras Main

Design Brief Aliport Commercial were first contacted in February 2016 about this project. St Pancras Catholic Primary required an outdoor Learning Area to be created that would provide shelter from the children from both the sun and the rain. Site Conditions Aliport Commercial undertook two site visits to fully understand the project, measure up and produce the designs for the new canopy. Careful planning had to be undertaken due to the tight time-scales of the works with initial enquiry in February with required completion in the Easter Holidays during April. Aliport Solution Aliport Commercial commenced works in April 2016 and…

May 31, 2016 / by Functio-km / Comments are off for this post